This is quite a large milestone, having the final control panel completed, this one controlling all of the points in the main Gunnedah yard section of the layout.
This now means that all points on the layout are operated from the control panels, with route selection clearly visible.
The completion of these panels also means that as far as wiring goes, all major electrical work on the top deck is now complete, which in itself is another major milestone.
The four control panels still need to be mounted properly, which will be done next, but having them plugged in and operational is a huge reward for what has been a considerable amount of work.
Cheers
Darren
Moorewood Colliery Revisited
-
A scene on my OO9 (1/76 scale on 9mm track) Moorewood Colliery. It’s fully
wired and working, but really needs finishing off and placing in a lit
dioram...
2 hours ago
1 comment:
Nice to see the control panels installed and operational!