475 days ago the first length of curved track and single set of points (highlighted
in green in the first picture) on the corner module leading into the main Gunnedah
yard section was permanently laid and operational.
475 days later the last pieces of track, the extension of the grain silo
road (closest to the backdrop) and the locomotive service roads (between the grain silo road and main line curving off to the right) on the corner module (highlighted in green in the second picture) at the opposite end
of the main Gunnedah yard, have
been laid and are operational.
This means that apart from the lift-out section that will go across the
doorway and link to the proposed helix, all of the track, and points (31) on the layout proper are permanently in
place and operational.
Whilst there is still lots to do on the layout, this is an exciting
milestone to have finally reached, especially given the circumstances under
which the layout has been constructed.
Cheers
Darren
Darren